Deer Mountain Water Structure
- Superintendent: Bryan O'Neill
This project is located in Lead, South Dakota and was completed in fall 2024. Our supervisor, Bryan O'Neill did a great job with the safety instruction on this project and ensured proper OSHA rules and regulations were being followed. We poured a large concrete structure called a "wet well" to temporarily hold fresh water, as well as a tank slab.